Cap Ingelec

Provides data center design-build services, including technical fit-outs and power infrastructure for colocation operators.

HQ FR Europe Design-build / EPC

Verified

Visit Cap Ingelec Compare with similar Request a quote

On the record

10 sourced facts
Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
Europe 1
Design-build, turnkey or EPC True where the company's own scope text says design-build, turnkey, EPC or design-through-commissioning delivery. Empty where the source describes a different role.
Yes 1
Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
3 1
Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
Telehouse 1
Client context The source's own wording on the named parties and their roles, for example tenant, owner or end-user, and any limit on the engagement.
Telehouse 1
Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
Design and build 1
Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
Telehouse TH3 Magny 2 Phase 2, Magny-les-Hameaux, France 1
Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
3 MW IT capacity in the second module 1
Data hall space Published technical area, with units and expansion qualifiers.
Second module: 1,600 sq m; two IT rooms 1
Design PUE Design power usage effectiveness of the reference project. A design figure, not measured operating PUE.
1.3 1

A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.

Sources

  1. capingelec.com: work in progress at the th3 paris magny 2 datacenter accessed 2026-11-11

Keep shortlisting

Get a quote from Cap Ingelec and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@datacenterconstructioncompanies.com.