Data center construction companies in North America

29 companies show data center work in North America in their own pages or project references. 5 state design-build, turnkey or EPC delivery and 9 show hyperscale work. The largest reference project is Hoffman Construction’s at 1 GW. Reference projects run from Quincy, Washington to Ashburn, Virginia and from Montreal to Atlanta.

Company Regions Delivery Reference project MW Disclosed clients
AECOM Tishman North America Construction management 7 MW Sentinel Data Centers, Russo Development
Balfour Beatty US North America Preconstruction and planning through commissioning and closeout; shell, pod buildouts and sitework for colocation — —
Black & Veatch North America Design-build / EPC — Nautilus Data Technologies
Brasfield & Gorrie North America Campus construction and live data hall build-outs 48 MW —
Clark Construction Group North America General contracting 24 MW NTT
Clark Pacific North America Early design-assist, advanced manufacturing, coordinated logistics, erection and onsite supervision of prefabricated building systems — —
Clayco North America Design-build / EPC — Galaxy Digital
Cupertino Electric North America Design-build / EPC 36.4 MW DuPont Fabros Technology, Yahoo!
DPR Construction North America — 64 MW Vantage Data Centers
EllisDon North America Ground-up data center through EllisDon DIVCO joint venture 56 MW Ericsson Canada
Fluor North America, Europe Design-build / EPC — TeraWulf
Gilbane Building Company North America Construction management — Digital Realty Trust
Hensel Phelps North America — — Meta
HITT Contracting North America — 4.5 MW —
Hoffman Construction North America — 1 GW —
Holder Construction North America Design-build / EPC, Construction management — —
JE Dunn Construction North America — — Meta
Kiewit Corporation North America Joint general contractor with Clayco for a portion of the campus — Oracle, STACK Infrastructure
McCarthy Building Companies North America — 64 MW Vantage Data Centers
Mortenson North America Construction management — QTS
PCL Construction North America — — Bank of Montreal
Pomerleau North America Construction management — —
Rosendin North America Electrical contractor; 20% of its data center projects incorporate design-build work — Meta
Sterling Infrastructure North America Large-scale site development, underground utilities and electrical/mechanical services for mission-critical projects — —
STO Building Group / STO Mission Critical North America, Europe Group capabilities include MEP infrastructure, commissioning and controls 4.5 MW —
Suffolk Construction North America Preconstruction, site development, core and shell, grading and civil utilities 200 MW —
The Whiting-Turner Contracting Company North America Adaptive reuse, MEP installation and raised access floor — —
Turner Construction Company North America Construction through a Turner–Wohlsen joint venture 100 MW CoreWeave
Walbridge North America Core-and-shell construction plus data hall build-outs in existing campus buildings 32 MW —

Worldwide builders

Burns & McDonnell, Jacobs, Skanska describe worldwide reach rather than a list of regions, so they sit outside the regional pages. Check their reference projects on their pages for work near you.

All 58 companies in the sortable table Hyperscale buildersDesign-build, EPC and construction managementEuropeAsia-Pacific