Hutchinson Builders
Australian builder delivering data centres on a design and construct basis since 2010, with projects for Global Switch, Telstra and Keppel.
Visit Hutchinson Builders Compare with similar Request a quote
On the record
10 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- Asia-Pacific 1
- Design-build, turnkey or EPC True where the company's own scope text says design-build, turnkey, EPC or design-through-commissioning delivery. Empty where the source describes a different role.
- Yes 1
- Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
- 3.7 1
- Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
- Design and construct; first data centre delivered on a design and construct basis in 2010 1
- Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
- Keppel Data Centre 1
- Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
- 3.7MW power 1
- Construction duration Published build duration for the reference project or phase.
- 66 weeks to build 1
- Reference project area (metric) sq m Published total floor area in square metres.
- 5,300 1
- Reference project value Published project or campus value in its original currency. Not the contractor's revenue.
- $125M 1
- Portfolio project count Count and scope as reported, keeping any plus sign and client limits.
- Global Switch Data Centre ($150M, 88 weeks, 18,894 m², 5 data floors, 1,850 W/m²); Telstra Global Data Centre ($19M, 44 weeks, 1,750 m², 360 racks); Keppel Data Centre ($125M, 66 weeks, 3.7MW, 5,300 m²) 1
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- Hutchinson Builders: Data Centres accessed 2026-11-11
Keep shortlisting
Pages that list Hutchinson Builders
Get a quote from Hutchinson Builders and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.