Black & Veatch
Provides EPC and integrated campus delivery combining data center facilities, generation, substations, water systems and lifecycle services.
On the record
9 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- North America 2
- Design-build, turnkey or EPC True where the company's own scope text says design-build, turnkey, EPC or design-through-commissioning delivery. Empty where the source describes a different role.
- Yes 1
- Hyperscale work True where a source says hyperscale or names Meta, Microsoft or Oracle as a client. Confidential clients stay confidential and are never inferred.
- Yes 1
- Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
- Nautilus Data Technologies 2
- Client context The source's own wording on the named parties and their roles, for example tenant, owner or end-user, and any limit on the engagement.
- Nautilus Data Technologies; disclosed engagement was due diligence and commissioning oversight, not whole-facility construction 2
- Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
- Full EPC across substations, generation, water and data center facilities 1
- Reference project location Where the project sits, as published. Not the headquarters.
- Port of Stockton, Northern California, United States 2
- Cooling Cooling technology documented for the company or its reference project.
- Chilled water, air cooling, direct-to-chip and immersion designs 1
- Customer segments Buyer groups the source names.
- Hyperscale, colocation and neocloud operators 1
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- bv.com: data center campus accessed 2026-11-11
- bv.com: commissioning for worlds first zero water consumption data center accessed 2026-11-11
Keep shortlisting
Pages that list Black & Veatch
Similar builders
Get a quote from Black & Veatch and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.