Cupertino Electric
Electrical engineering and construction firm that designs, builds and commissions data centers, with more than 21 million sq ft of data center space delivered since the 1990s. Its modular division has installed 2,000 data center modules totaling 2 GW, and it adds capacity to live facilities while they keep running.
Visit Cupertino Electric Compare with similar Request a quote
On the record
16 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- North America 1
- Design-build, turnkey or EPC True where the company's own scope text says design-build, turnkey, EPC or design-through-commissioning delivery. Empty where the source describes a different role.
- Yes 3
- Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
- 36.4 3
- Portfolio capacity MW Cumulative, annual or pipeline megawatts the company reports for itself. Read it with its basis; the figures are not like for like.
- 2,000 2
- Portfolio basis What the portfolio megawatts measure: delivered to date, delivered or under way, delivered per year, pipeline, or developed as an owner-operator.
- Delivered 2
- Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
- DuPont Fabros Technology, Yahoo! 1
- Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
- DuPont Fabros Technology data center, Santa Clara, California (CEI-designed and -engineered, design/build) 3
- Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
- 36.4 MW total aggregate critical load 3
- Reference project location Where the project sits, as published. Not the headquarters.
- Santa Clara, California, United States 3
- Reference project status Milestone and date at the source. A historical announcement does not prove completion.
- Completed 3
- Construction duration Published build duration for the reference project or phase.
- Completed in fourteen months 3
- Reference project area sq ft Published building or project area. Per-building and partial-campus figures are qualified in Area basis.
- 360,000 3
- Portfolio capacity statement The vendor's own capacity claim, word for word in meaning, with its basis.
- More than 21 million sq ft of data center space designed, installed and commissioned since the 1990s; 2,000 data center modules and 2 GW of modular capacity delivered 1
- Customer segments Buyer groups the source names.
- High-tech, colocation, social media and healthcare data center owners 1
- Specialist technical services Documented engineering, equipment or commissioning services.
- Modular product design and development, offsite assembly and integration, field services and commissioning 2
- Live-site retrofit True only where the vendor explicitly offers retrofit or expansion inside live buildings.
- Yes 1
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- Cupertino Electric: Data Center accessed 2026-11-11
- Cupertino Electric: Modular accessed 2026-11-11
- Cupertino Electric: DuPont Fabros Technology Data Center accessed 2026-11-11
Keep shortlisting
Pages that list Cupertino Electric
Similar builders
Get a quote from Cupertino Electric and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.