Jacobs

Engineering and delivery firm for hyperscale and AI data centers, with more than 5,000 MW delivered or in design over the past decade. It runs EPCM, design-build and program management delivery across the Americas, Europe, the Middle East and Asia-Pacific.

HQ US Global Design-build / EPC Hyperscale work

Verified

Visit Jacobs Compare with similar Request a quote

On the record

16 sourced facts
Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
Global 1
Design-build, turnkey or EPC True where the company's own scope text says design-build, turnkey, EPC or design-through-commissioning delivery. Empty where the source describes a different role.
Yes 1
Hyperscale work True where a source says hyperscale or names Meta, Microsoft or Oracle as a client. Confidential clients stay confidential and are never inferred.
Yes 1
Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
245 1
Portfolio capacity MW Cumulative, annual or pipeline megawatts the company reports for itself. Read it with its basis; the figures are not like for like.
5,000 1
Portfolio basis What the portfolio megawatts measure: delivered to date, delivered or under way, delivered per year, pipeline, or developed as an owner-operator.
Delivered or under way 1
Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
Hut 8 1
Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
EPCM, design-build, program management and digital delivery models 1
Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
Hut 8 River Bend data center, Louisiana (EPCM services) 1
Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
245 MW of IT capacity leased under a 15-year lease 1
Reference project location Where the project sits, as published. Not the headquarters.
River Bend, Louisiana, United States 1
Portfolio capacity statement The vendor's own capacity claim, word for word in meaning, with its basis.
5,000+ MW delivered or in design for hyperscale and AI data centers globally over the past decade 1
Portfolio project count Count and scope as reported, keeping any plus sign and client limits.
Hut 8 River Bend (Louisiana); SINES Data Campus for Start Campus (Sines, Portugal); Utah data center; Spartanburg AI data center campus conversion; flexible colocation data center program 1
Customer segments Buyer groups the source names.
Cloud, hyperscale, colocation and AI operators 1
Geography as stated The geographic coverage in the company's own words.
Americas, Europe, Middle East and Asia Pacific; more than 40 countries 1
Headquarters Head office as the source states it.
Dallas, Texas 2

A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.

Sources

  1. Jacobs: Data Centers accessed 2026-11-11
  2. Jacobs Relocates Global Headquarters to Dallas (press release) accessed 2026-11-11

Keep shortlisting

Get a quote from Jacobs and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@datacenterconstructioncompanies.com.