Jacobs
Engineering and delivery firm for hyperscale and AI data centers, with more than 5,000 MW delivered or in design over the past decade. It runs EPCM, design-build and program management delivery across the Americas, Europe, the Middle East and Asia-Pacific.
On the record
16 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- Global 1
- Design-build, turnkey or EPC True where the company's own scope text says design-build, turnkey, EPC or design-through-commissioning delivery. Empty where the source describes a different role.
- Yes 1
- Hyperscale work True where a source says hyperscale or names Meta, Microsoft or Oracle as a client. Confidential clients stay confidential and are never inferred.
- Yes 1
- Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
- 245 1
- Portfolio capacity MW Cumulative, annual or pipeline megawatts the company reports for itself. Read it with its basis; the figures are not like for like.
- 5,000 1
- Portfolio basis What the portfolio megawatts measure: delivered to date, delivered or under way, delivered per year, pipeline, or developed as an owner-operator.
- Delivered or under way 1
- Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
- Hut 8 1
- Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
- EPCM, design-build, program management and digital delivery models 1
- Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
- Hut 8 River Bend data center, Louisiana (EPCM services) 1
- Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
- 245 MW of IT capacity leased under a 15-year lease 1
- Reference project location Where the project sits, as published. Not the headquarters.
- River Bend, Louisiana, United States 1
- Portfolio capacity statement The vendor's own capacity claim, word for word in meaning, with its basis.
- 5,000+ MW delivered or in design for hyperscale and AI data centers globally over the past decade 1
- Portfolio project count Count and scope as reported, keeping any plus sign and client limits.
- Hut 8 River Bend (Louisiana); SINES Data Campus for Start Campus (Sines, Portugal); Utah data center; Spartanburg AI data center campus conversion; flexible colocation data center program 1
- Customer segments Buyer groups the source names.
- Cloud, hyperscale, colocation and AI operators 1
- Geography as stated The geographic coverage in the company's own words.
- Americas, Europe, Middle East and Asia Pacific; more than 40 countries 1
- Headquarters Head office as the source states it.
- Dallas, Texas 2
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- Jacobs: Data Centers accessed 2026-11-11
- Jacobs Relocates Global Headquarters to Dallas (press release) accessed 2026-11-11
Keep shortlisting
Get a quote from Jacobs and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.