Mace Construct
Constructs data centers and associated shells and infrastructure for developers. It operates separately from Mace Consult and announced a change of name to Forco for January 2027.
On the record
8 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- Europe 1
- Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
- 70 1
- Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
- Pure DC 1
- Client context The source's own wording on the named parties and their roles, for example tenant, owner or end-user, and any limit on the engagement.
- Pure DC 1
- Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
- Cold-shell construction for Building 2, enabling later fit-out 1
- Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
- Pure DC Brent Cross LON01 Building 2, North London, United Kingdom 1
- Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
- Source describes 70 MW planned campus capacity; shell preparation does not establish energized IT capacity 1
- Name and corporate status Separation, trade name or rebrand announced as of the access date.
- Trading as Mace Construct on access date; Forco brand scheduled January 2027 2
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- macegroup.com: pure dc brent cross campus accessed 2026-11-11
- macegroup.com: mace construct to become forco from january 2027 accessed 2026-11-11