Multiplex
Builds large data centres across Australia for NEXTDC and GreenSquareDC, including the 350 MW S4 Sydney campus at Horsley Park.
On the record
10 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- Asia-Pacific 1
- Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
- 350 1
- Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
- NEXTDC, GreenSquareDC 1
- Client context The source's own wording on the named parties and their roles, for example tenant, owner or end-user, and any limit on the engagement.
- Six-year relationship with NEXTDC across Perth, Brisbane and Sydney; engaged on S4 initial design in April 2022, Early Contractor Involvement from mid-2024 1
- Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
- NEXTDC S4 Sydney, Horsley Park 1
- Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
- 350MW planned 1
- Reference project location Where the project sits, as published. Not the headquarters.
- 16 Johnston Crescent, Horsley Park, Western Sydney, NSW, Australia 1
- Reference project status Milestone and date at the source. A historical announcement does not prove completion.
- Under construction (works began March 2026) 1
- Completion or scheduled delivery Actual completion where stated, otherwise a labelled target.
- Mid-2027 1
- Portfolio project count Count and scope as reported, keeping any plus sign and client limits.
- NEXTDC S2 Sydney (Macquarie Park); S3 Sydney stages one and two (Artarmon); S6 Sydney (Artarmon); expansions at B2 Brisbane (Fortitude Valley) and P1 Perth (Malaga); GreenSquareDC WAi1, Belmont, Perth (96MW) 1
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- IT Brief Australia: Multiplex starts construction on NEXTDC's S4 Sydney accessed 2026-11-11
- iTnews: GreenSquareDC signs Multiplex for data centre build accessed 2026-11-11