On the record

15 sourced facts
Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
North America 1
Hyperscale work True where a source says hyperscale or names Meta, Microsoft or Oracle as a client. Confidential clients stay confidential and are never inferred.
Yes 1
Portfolio capacity MW Cumulative, annual or pipeline megawatts the company reports for itself. Read it with its basis; the figures are not like for like.
15,000 1
Portfolio basis What the portfolio megawatts measure: delivered to date, delivered or under way, delivered per year, pipeline, or developed as an owner-operator.
Delivered 1
Disclosed clients Clients, operators or tenants the source names, as short names. Their roles are under Client context. Never an inferred identity.
Meta 2
Client context The source's own wording on the named parties and their roles, for example tenant, owner or end-user, and any limit on the engagement.
Meta (owner); JE Dunn (general contractor) 2
Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
Electrical contractor; 20% of its data center projects incorporate design-build work 1
Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
Meta Temple Data Center, Temple, Texas (electrical contractor, with general contractor JE Dunn) 2
Reference project location Where the project sits, as published. Not the headquarters.
Temple, Texas, United States 2
Reference project area sq ft Published building or project area. Per-building and partial-campus figures are qualified in Area basis.
900,000 2
Reference project value Published project or campus value in its original currency. Not the contractor's revenue.
$800 million data center building and site infrastructure 2
Portfolio capacity statement The vendor's own capacity claim, word for word in meaning, with its basis.
15+ GW: total power deployed by Rosendin's data center projects 1
Customer segments Buyer groups the source names.
High-tech companies and co-location providers; enterprise, cloud and AI projects 1
Specialist technical services Documented engineering, equipment or commissioning services.
Design, manufacture, installation and commissioning of integrated modular solutions for critical-power applications; 7,000+ MW annual fabrication capacity 1
Headquarters Head office as the source states it.
San Jose, California 1

A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.

Sources

  1. Rosendin: Data Centers accessed 2026-11-11
  2. Texas Contractor: Rosendin selected to build Meta's Temple data center in Texas accessed 2026-11-11

Keep shortlisting

Get a quote from Rosendin and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@datacenterconstructioncompanies.com.