Walbridge
Builds mission critical facilities, core-and-shell data centers and data hall fit-outs inside existing campus buildings.
On the record
9 sourced facts- Regions Where the sources show the company building: regions named in its own pages plus the locations of its listed reference projects. Not a promise of service everywhere.
- North America 1
- Reference project MW Headline megawatts of the named reference project, as its source states them. Planned, contracted and delivered figures are mixed; the Reference project capacity field on each company page carries the basis. Never a company total.
- 32 1
- Contracting role and services The role or scope the company states: whole facility, shell and core, construction management, MEP, EPC.
- Core-and-shell construction plus data hall build-outs in existing campus buildings 1
- Reference project A named or confidential project from the company's own page. One project, not the whole portfolio.
- Two confidential core-and-shell data centers, Ohio, United States 1
- Reference project capacity and basis Source-reported project capacity with its qualifiers: electrical or IT basis, planned or delivered, the contractor's scope.
- Source describes two “32MW 8 POD” core-and-shell buildings; 32 MW is quoted per described building, not asserted as delivered IT load 1
- Reference project area sq ft Published building or project area. Per-building and partial-campus figures are qualified in Area basis.
- 155,000 1
- Area basis Whether the area is per building, campus or partial works.
- 155,000 sq ft per building, not the two-building total 1
- Reference project buildings Building count or configuration for the reference project.
- 2 1
- Redundancy Power or cooling redundancy for the reference project.
- N+1 cooling arrangement 1
A project figure belongs to that project. It is not a company total, and a planned or announced figure is not a delivery. Fields the company has not published on the pages we read are left out.
Sources
- walbridge.com: mission critical customer two core shell data centers accessed 2026-11-11
Keep shortlisting
Pages that list Walbridge
Get a quote from Walbridge and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.